|
October 27th
brought the end to a great boating season. The day was nice; a
bright sun and temperatures in the 60's.
Had an appointment for 3:00
in the afternoon to have the boat hoisted out and moved by
trailer to the parking lot in front of our slip. |
The following
week, the boat was shrink wrapped. |
|
|
click
images to enlarge
|
|
|
|
Pulling
into the back channel and around to the hoist
|
|
|
|
|
|
|
The hoist
pulls the boat out of the water
|
|
|
|
|
|
|
After a
powerwash, the trailer takes boat to parking spot
|
|
|
|
|
The
interior is prepped to make sure air circulates and dampness doesn't
wreak havoc. |
|
|
|
|
|
|
|
|
|
|
|
|
Asleep for
the Winter |
The boat
is shrink wrapped and sits out in front of our slip for the winter. |